LEGNICA-LUBAWKA

EXPRESS ROAD S3 – LEGNICA-LUBAWKA

For our customer Porr S.A., we delivered T-beams for the Bolków - Kamienna Góra section of the S3 expressway. The prefabricated elements were installed at night above a railway line, which required special precautions and security measures.

  • wskaźnik
    28m

    LENGTH OF BRIDGE BEAMS

  • wskaźnik
    500t

    PRESTRESSING FORCE IN BEAMS

GALLERY OF FINISHED PROJECTS

Prefabrykaty na budowę drogi ekspresowej
OPEN PHOTO
Prefabrykaty na budowę drogi ekspresowej
OPEN PHOTO
Prefabrykaty na budowę drogi ekspresowej
OPEN PHOTO
Prefabrykaty na budowę drogi ekspresowej
OPEN PHOTO
Budowa drogi ekspresowej
OPEN PHOTO
Budowa drogi ekspresowej
OPEN PHOTO
Budowa drogi ekspresowej
OPEN PHOTO
Droga ekspresowa S3
OPEN PHOTO
Droga ekspresowa S3
OPEN PHOTO

Description of execution

We supplied prefabricated bridge beams for Porr S.A. The elements were part of the construction of a road viaduct as part of the contract: ‘Design and construction of the S3 Legnica (A4) – Lubawka Task III road, approx. 16.1 km in length, from the Bolków junction (without the junction) to the Kamienna Góra Północ junction (without the junction).


The project included the construction of 66 prestressed T-beams with lengths of 27 and 28 metres, each of which was individually designed by the IVIA design studio.


The beams were characterised by a high compressive force of over 500 tonnes, thanks to which the prefabricated elements obtained high resistance to heavy loads – a particularly important feature in the construction of bridge or viaduct structures.


In order to minimise the impact on traffic flow, the installation of the beams over the railway line took place overnight, which required special precautions and safeguards, as well as detailed planning of deliveries and installation times.


Due to the short lead time, we delivered a total of 16 prefabricated elements each day. This allowed the project to be completed on time.


The entire process was carried out in accordance with safety standards and regulations to avoid possible accidents and threats to employees and other people.

SHARE:

  • Udostępnij pocztą
  • Udostępnij linkedin
  • Udostępnij facebook

PROJECT INFORMATION

(1)

RELATED FINISHED PROJECTS

(1)

RELATED PRODUCTS

Belka mostowa typu T - profil

Bridge beams and slabs

Bridge beam T

SEE

DOWNLOAD DOCUMENTS

PRODUCT FEATURES

No formwork

No formwork is required for the load-bearing structure

Time

Prefabricated elements significantly speed up project implementation

Grade of concrete

Grade of concrete C40/50 or C50/60

Surface

Upper surface of the precast element rough, with protruding reinforcement of phase II, prepared for bonding

Typicality

Production according to standard catalogue dimensions or based on individual designs

certyfikaty

Certyfikat | Długołęka | El. mostów

certyfikaty

Certyfikat | Kielce1 | El. mostów

certyfikaty

Certyfikat | Kielce2 | El. mostów

deklaracje

dwu | Długołęka | El. mostów

deklaracje

dwu | Długołęka | El. mostów sprężane

deklaracje

dwu | Kielce1 | El. mostów sprężane C40/50

deklaracje

dwu | Kielce2 | El. mostów sprężane T C50/60

deklaracje

dwu | Kielce2 | El. mostów sprężane T C40/50

DOWNLOAD ALL DOCUMENTSPobierz wszystkie

CONTACT

Ręce trzymające telefon.

CONTACT US

Every day, our specialists ensure that optimised production, logistics and customer service processes allow for even more efficient execution of our Partners' projects. Contact us.

Contact us