Description of execution
We are supplying Mostostal Warszawa SA with more than 1,100 prefabricated reinforced concrete channels with a total length of 1,660 metres. The elements are intended for the reconstruction of the locomotive hall at Wrocław Główny station, where traction vehicles will be technically inspected and rail vehicles will undergo emergency and routine repairs.
Currently, the first and second stage of the locomotive hall reconstruction has been completed. For the first stage, we delivered 369 prefabricated duct elements with a total length of 553.5 m, and for the second stage, 319 elements with a total length of 478.5 m. The third stage of the reconstruction is still pending, for which we will deliver 419 prefabricated elements with a total length of 628.5 metres. The individual elements of the channel have the following dimensions: length 150 cm, width 200 cm, height 150 and 100 cm.
The mould for the production of the channels has been shaped in such a way that the channel can be drained and the required recesses for the relevant systems can be created.
*For over 30 years, we have specialised in the manufacturing of prefabricated elements for construction: from residential buildings, through public utility and industrial facilities, to complex elements of civil engineering, road, bridge, and hydraulic and structures. Our goal is to produce the highest quality building materials from concrete, including customised prefabricated elements made to order for companies and individual recipients, regardless of the type and size of the investment.
