WROCŁAW

RECONSTRUCTION OF INSPECTION PITS – LOCOMOTIVE DEPOT OF THE MAIN STATION | WROCŁAW

As part of the Operational Programme Infrastructure and Environment 2014-2020, the project ‘Time for good connections - modernisation of wagons and locomotives for PKP Intercity’ involves the reconstruction of the locomotive hall at Wrocław-Główny station. We are supplying prefabricated service ducts for this investment.

  • wskaźnik
    +1100

    PREFABRICATED INSPECTION PITS

GALLERY OF FINISHED PROJECTS

Przebudowa kanałów rewizyjnych w lokomotywowni dworca Wrocław Główny
OPEN PHOTO
Przebudowa kanałów rewizyjnych w lokomotywowni dworca Wrocław Główny
OPEN PHOTO
Przebudowa kanałów rewizyjnych w lokomotywowni dworca Wrocław Główny
OPEN PHOTO
Przebudowa kanałów rewizyjnych w lokomotywowni dworca Wrocław Główny
OPEN PHOTO
Przebudowa kanałów rewizyjnych w lokomotywowni dworca Wrocław Główny
OPEN PHOTO
Przebudowa kanałów rewizyjnych w lokomotywowni dworca Wrocław Główny
OPEN PHOTO
Przebudowa kanałów rewizyjnych w lokomotywowni dworca Wrocław Główny
OPEN PHOTO
Przebudowa kanałów rewizyjnych w lokomotywowni dworca Wrocław Główny
OPEN PHOTO

Description of execution

We are supplying Mostostal Warszawa SA with more than 1,100 prefabricated reinforced concrete channels with a total length of 1,660 metres. The elements are intended for the reconstruction of the locomotive hall at Wrocław Główny station, where traction vehicles will be technically inspected and rail vehicles will undergo emergency and routine repairs.


Currently, the first and second stage of the locomotive hall reconstruction has been completed. For the first stage, we delivered 369 prefabricated duct elements with a total length of 553.5 m, and for the second stage, 319 elements with a total length of 478.5 m. The third stage of the reconstruction is still pending, for which we will deliver 419 prefabricated elements with a total length of 628.5 metres. The individual elements of the channel have the following dimensions: length 150 cm, width 200 cm, height 150 and 100 cm.


The mould for the production of the channels has been shaped in such a way that the channel can be drained and the required recesses for the relevant systems can be created.


*For over 30 years, we have specialised in the manufacturing of prefabricated elements for construction: from residential buildings, through public utility and industrial facilities, to complex elements of civil engineering, road, bridge, and hydraulic and structures. Our goal is to produce the highest quality building materials from concrete, including customised prefabricated elements made to order for companies and individual recipients, regardless of the type and size of the investment.

SHARE:

  • Udostępnij pocztą
  • Udostępnij linkedin
  • Udostępnij facebook

PROJECT INFORMATION

(4)

RELATED FINISHED PROJECTS

(1)

RELATED PRODUCTS

Kanały technologiczne - profil

Foundation elements

Service ducts

SEE

DOWNLOAD DOCUMENTS

PRODUCT FEATURES

Speed

Speed of construction

Elimination of work

Elimination of formwork on site

Equipment limitation

Reduction of equipment on site

Parameters

Ensuring expected water and frost resistance

certyfikaty

Certyfikat | Długołęka Przywory Wieruszów Kielce I Kielce II Gajków Środa Śląska | El. do zastosowań konstrukcyjnych

deklaracje

dwu / Długołęka / Kanały technologiczne

DOWNLOAD ALL DOCUMENTSPobierz wszystkie

CONTACT

Ręce trzymające telefon.

CONTACT US

Every day, our specialists ensure that optimised production, logistics and customer service processes allow for even more efficient execution of our Partners' projects. Contact us.

Contact us