Description of execution
On order of Intercor, we delivered elements for the construction of a fully prefabricated, multi-storey car park integrated with a transport hub on Górka Narodowa in Kraków. This two-storey car park is part of the construction of the Kraków Fast Tram line and provides a place for 465 vehicles.
The prefabricated elements were produced in three branches: Długołęka, Przywory and Kielce 1. The production process included the manufacture of various structural elements, which were then delivered to the construction site.
We supplied:
- 130 support columns, up to 10 m high,
- 187 reinforced concrete beams, up to 10 m long,
- 40 prestressed beams, with a stepped cross-section, up to 150 cm high, on which the floor slabs and reinforced concrete beams were supported,
- 146 solid walls, measuring up to 5 x 2.5 m,
- 12 three-layer walls,
- 11 reinforced concrete slabs,
- 26 flights and landings,
- 104 planters, arranged inside the car park and on its roof, in seven different sizes
The production and delivery of prefabricated elements for the construction of a multi-storey car park on Górka Narodowa in Kraków was carried out with the utmost care for quality and precision. The prefabricated concrete elements we supplied enabled the efficient construction of a modern car park, which is an integral part of the Kraków Fast Tram interchange, improving the city's transport infrastructure.