WROCŁAW

WESTERN AXIS – WROCŁAW

The construction of the Western Axis is one of the most important and probably most anticipated investments in the capital of Lower Silesia. We supplied our Customer with prefabricated bridge beams for the construction of a viaduct over railway tracks.

  • wskaźnik
    144

    PREFABRICATED T-TYPE BRIDGE BEAMS

  • wskaźnik
    27m

    SPAN OF LONGEST T-TYPE BRIDGE BEAMS

GALLERY OF FINISHED PROJECTS

...
OPEN PHOTO
...
OPEN PHOTO
...
OPEN PHOTO
...
OPEN PHOTO
...
OPEN PHOTO
...
OPEN PHOTO
...
OPEN PHOTO
...
OPEN PHOTO
...
OPEN PHOTO

Description of execution

As part of the city's investment project: ‘Construction of the Western Axis in Wrocław along national road No. 94’, we had the opportunity to supply prefabricated bridge beams for the construction of a road viaduct along Aleja Stabłowicka.


The construction of the Western Axis is one of the key investments for Wrocław, which aims to solve the eternal problem of traffic jams on the national road No. 94 towards Leśnica.


The project is being carried out on the order of the City of Wrocław, and our Customer was Przedsiębiorstwo Robót Inżynieryjnych KBI.


We produced and delivered 144 pre-stressed T-beams of different lengths (18, 21, 24 and 27 metres) for the General Contractor. The prefabricated elements were used to build an important section of the route, a 143-metre road viaduct over the railway tracks. This will enable traffic to flow smoothly without the need to stop at the barriers. Building viaducts over railway tracks where train traffic cannot be shut down is a complicated undertaking – assembly was required at certain times at night, when train traffic was halted.

‘Together with KBI, we had the opportunity to create the infrastructure of our city together. We get particularly satisfied from projects that develop the infrastructure we use every day and make our city more and more liveable and workable. Thanks to the merger with Sibet, a former Kielce-based company, we were able to produce beams much closer to their final place of installation. Thanks to such measures, we take care of our common good by reducing the amount of diesel fuel burned during transport’. Wojciech Ruman, Project Manager, Betard.

SHARE:

  • Udostępnij pocztą
  • Udostępnij linkedin
  • Udostępnij facebook

PROJECT INFORMATION

(2)

RELATED FINISHED PROJECTS

(1)

RELATED PRODUCTS

Belka mostowa typu T - profil

Bridge beams and slabs

Bridge beam T

SEE

DOWNLOAD DOCUMENTS

PRODUCT FEATURES

No formwork

No formwork is required for the load-bearing structure

Time

Prefabricated elements significantly speed up project implementation

Grade of concrete

Grade of concrete C40/50 or C50/60

Surface

Upper surface of the precast element rough, with protruding reinforcement of phase II, prepared for bonding

Typicality

Production according to standard catalogue dimensions or based on individual designs

certyfikaty

Certyfikat | Długołęka | El. mostów

certyfikaty

Certyfikat | Kielce1 | El. mostów

certyfikaty

Certyfikat | Kielce2 | El. mostów

deklaracje

dwu | Długołęka | El. mostów

deklaracje

dwu | Długołęka | El. mostów sprężane

deklaracje

dwu | Kielce1 | El. mostów sprężane C40/50

deklaracje

dwu | Kielce2 | El. mostów sprężane T C50/60

deklaracje

dwu | Kielce2 | El. mostów sprężane T C40/50

DOWNLOAD ALL DOCUMENTSPobierz wszystkie

CONTACT

Ręce trzymające telefon.

CONTACT US

Every day, our specialists ensure that optimised production, logistics and customer service processes allow for even more efficient execution of our Partners' projects. Contact us.

Contact us