In Jawczyce near Warsaw, we were a partner in the construction of a data processing centre. The scope of our work included design, production, transport and assembly of concrete prefabricated elements.

  • wskaźnik
    21m

    LENGTH OF PRESTRESSED BEAMS

  • wskaźnik
    ~5400m³

    PRESTRESSED HOLLOW CORE UNITS

GALLERY OF FINISHED PROJECTS

Budowa Kampus Data4 Jawczyce
OPEN PHOTO
Budowa Kampus Data4 Jawczyce
OPEN PHOTO
Budowa Kampus Data4 Jawczyce
OPEN PHOTO
Budowa Kampus Data4 Jawczyce
OPEN PHOTO
Budowa Kampus Data4 Jawczyce
OPEN PHOTO
Budowa Kampus Data4 Jawczyce
OPEN PHOTO
Budowa Kampus Data4 Jawczyce
OPEN PHOTO
Budowa Kampus Data4 Jawczyce
OPEN PHOTO

Description of execution

At the order of our customers, the consortium of HOCHTIEF Polska and Adamietz, we produced prefabricated concrete elements for the construction of a modern data centre located on the campus of Data4, a leading European operator and investor in the data centre market, which further emphasises the prestige of our partnership. The designed building consists of two parts: a technological part and an office part.


The comprehensive scope of our work included: workshop design, production, transport and precise assembly of prefabricated elements.


As part of this project, we delivered a wide range of prefabricated elements, tailored to the needs of the project.


  1. 79 columns
  2. 178 beams
  3. 21 beam walls
  4. 32 prestressed beams
  5. 41 single-layer base walls
  6. 41 walls
  7. 16 stair flights
  8. 5,400m2 of pre-stressed hollow core units


One of the key challenges during the project was the limited construction site where the building was being constructed. Thanks to our ability to adapt flexibly to the site conditions and effective logistical planning, we were able to successfully meet these difficulties, which contributed to the rapid progress of the construction work.


Our team of specialists worked with full commitment to deliver prefabricated elements in accordance with the highest standards of quality and timeliness. We prepared workshop designs with great care, which enabled smooth production and assembly of the elements.

SHARE:

  • Udostępnij pocztą
  • Udostępnij linkedin
  • Udostępnij facebook

PROJECT INFORMATION

(5)

RELATED FINISHED PROJECTS

(4)

RELATED PRODUCTS

Belka żelbetowa - profil

Beams

Reinforced concrete beam

SEE

DOWNLOAD DOCUMENTS

PRODUCT FEATURES

Grade of concrete

Concrete of grade C20/25 to C50/60, reinforcement steel AIIIN

Speed

Fast work on the construction site

Quality

High quality elements - three moulded surfaces and bevelled edges.

Work on site

Elimination of formwork and reinforcement work at height

Accessories

Built-in transport handles and accessories for connecting to the structure

certyfikaty

Certyfikat | Długołęka Przywory Wieruszów Gajków Kielce2 Środa Śląska | El. prętowe

certyfikaty

Certyfikat | Bydgoszcz | El. prętowe

certyfikaty

Certyfikat | Kielce1 | El. prętowe

deklaracje

dwu | Długołęka | Belki

deklaracje

dwu | Gajków | Belki

deklaracje

dwu | Przywory | Belki

deklaracje

dwu | Wieruszów | Belki

deklaracje

dwu | Kielce1 | Belki

deklaracje

dwu | Bydgoszcz | Belki

certyfikaty

Certyfikat / Długołęka / El. prętowe żelbetowe i sprężane / DE

DOWNLOAD ALL DOCUMENTSPobierz wszystkie
Podwaliny - profil

Foundation elements

Base wall

SEE

DOWNLOAD DOCUMENTS

PRODUCT FEATURES

QUALITY

High-quality elements with bevelled edges

SPEED

Quick installation on site

TIME

Reduced lead time, no need for vertical formwork

FINISHING

Exposed concrete can be used as a finishing layer

INSULATION

Sandwich elements with polystyrene, wool and PIR foam insulation

ACCESSORIES

The components can be supplied with connection accessories and steel

certyfikaty

Certyfikat | Długołęka Wieruszów Przywory Gajków Środa Śląska | El. ścian

certyfikaty

Certyfikat | Bydgoszcz | El. ścian

certyfikaty

Certyfikat | Kielce1 | El. ścian

deklaracje

dwu | Przywory | El. ścian

deklaracje

dwu | Gajków | El. ścian

deklaracje

dwu | Kielce1 | El. ścian

deklaracje

dwu | Wieruszów | El. ścian

deklaracje

dwu | Bydgoszcz | El. ścian

deklaracje

dwu | Długołęka | El. ścian

DOWNLOAD ALL DOCUMENTSPobierz wszystkie
Biegi schodowe prefabrykowane - profil

Staircase elements

Stair flights and landings

SEE

DOWNLOAD DOCUMENTS

PRODUCT FEATURES

Speed

Rapid construction on site

Quality

High component quality and repeatability

Formwork-free technology

Elimination of complicated, time-consuming formwork and reinforcement on the construction site as well as formwork removal

Site traffic

Providing traffic during the construction of storeys

Surface

Lower surface does not require plastering (can be painted)

Adaptation

Possibility of forming the component in the reverse position (negative)

certyfikaty

Certyfikat | Długołęka Przywory Wieruszów Kielce2 Środa Śląska | El. biegów schodowych

certyfikaty

Certyfikat | Kielce I | El. biegów schodowych

certyfikaty

Certyfikat | Długołęka Przywory Wieruszów Kielce2 Środa Śląska | El. Biegów schodowych

certyfikaty

Certyfikat | Bydgoszcz | El. klatek schodowych

certyfikaty

Certyfikat / Długołęka / Biegi schodowe / DE

deklaracje

dwu | Bydgoszcz | El. klatek schodowych

deklaracje

dwu | Długołęka | El. biegów schodowych

deklaracje

dwu | Kielce I | El. biegów schodowych

deklaracje

dwu | Wieruszów | El. biegów schodowych

deklaracje

dwu | Przywory | El. biegów schodowych

DOWNLOAD ALL DOCUMENTSPobierz wszystkie
Płyta kanałowa sprężona HCU - profil

Floor elements

Prestressed hollow core unit

SEE

DOWNLOAD DOCUMENTS

PRODUCT FEATURES

Load-bearing capacity

High floor load-bearing capacity with relatively low construction height (high slenderness)

Span

Possible use of large spans of up to 19 metres

Fire resistance

high fire resistance, up to REI240, without any additional surface protection

Weight

Relatively low construction weight

Installation

Quick installation (we offer the possibility of renting the spreader)

Modularity

Standard product modularity - 120 cm wide

certyfikaty

Certyfikat | Długołęka | Płyty kanałowe S i HCU

deklaracje

dwu | Długołęka | Płyty HCU 160 REI60

deklaracje

dwu | Długołęka | Płyty HCU 200 REI120

deklaracje

dwu | Długołęka | Płyty HCU 265 REI120

deklaracje

dwu | Długołęka | Płyty HCU 320 REI60

deklaracje

dwu | Długołęka | Płyty HCU 265 REI60

deklaracje

dwu | Długołęka | Płyty HCU 200 REI60

deklaracje

dwu | Długołęka | Płyty HCU 320 REI120

deklaracje

dwu | Długołęka | Płyty HCU 400 REI120

deklaracje

dwu | Długołęka | Płyty HCU 500 REI120

deklaracje

dwu | Długołęka | Płyty HCU 200A REI120

deklaracje

dwu | Długołęka | Płyty HCU 265A REI120

deklaracje

dwu | Długołęka | Płyty HCU 265A REI60

deklaracje

dwu | Długołęka | Płyty HCU 200A REI60

deklaracje

dwu | Długołęka | Płyty HCU 500 REI60

deklaracje

dwu | Długołęka | Płyty HCU 400 REI60

DOWNLOAD ALL DOCUMENTSPobierz wszystkie

CONTACT

Ręce trzymające telefon.

CONTACT US

Every day, our specialists ensure that optimised production, logistics and customer service processes allow for even more efficient execution of our Partners' projects. Contact us.

Contact us