Description of execution
The project involved the construction of a building with a cubic capacity of 18,000m2.
For this investment, Betard designed, produced and delivered nearly 500 prefabricated elements: foundations, docks, columns, reinforced concrete beams, staircase elements.
Due to the two-storey hall structure, prefabricated floors made of hollow core units and appropriately high columns of almost 17 metres were produced.
The total surface area of the hollow core units was over 10,000 m2. 95% of the slabs were 500 mm high hollow core slabs!
For this project, we manufactured and supplied the prefabricated:
base walls – 146
docks – 15
columns – 179
reinforced concrete beams – 150
stair flights – 6