WROCŁAW

BERNARDYŃSKA 4 APARTMENT BUILDING – WROCŁAW

In the centre of Wrocław, at ul. Bernardyńska 4, a residential and commercial building with an underground car park is being built for Toscom Development. For this project, we were responsible for the production of prefabricated concrete elements such as stair flights, filigree floors, balcony slabs and façade elements. It was a great challenge to meet the visual requirements of the elements designed by the architects from Maćków Pracownia Projektowa design studio.

  • wskaźnik
    126

    DIFFERENT TYPES OF BALCONIES

GALLERY OF FINISHED PROJECTS

Apartamentowiec Bernardyńska 4 Wrocław
OPEN PHOTO
Apartamentowiec Bernardyńska 4 Wrocław
OPEN PHOTO
Apartamentowiec Bernardyńska 4 Wrocław
OPEN PHOTO
Apartamentowiec Bernardyńska 4 Wrocław
OPEN PHOTO
Apartamentowiec Bernardyńska 4 Wrocław
OPEN PHOTO
Apartamentowiec Bernardyńska 4 Wrocław
OPEN PHOTO
Apartamentowiec Bernardyńska 4 Wrocław
OPEN PHOTO
Apartamentowiec Bernardyńska 4 Wrocław
OPEN PHOTO
Apartamentowiec Bernardyńska 4 Wrocław
OPEN PHOTO
Elewacja apartamentowca wykonana z czerwonej cegły i prefabrykatów betonowych barwionych w masie
OPEN PHOTO
Elewacja apartamentowca wykonana z prefabrykatów
OPEN PHOTO
Elewacja apartamentowca wykonana z prefabrykatów
OPEN PHOTO
Elewacja apartamentowca wykonana z prefabrykatów
OPEN PHOTO
Elewacja apartamentowca wykonana z prefabrykatów
OPEN PHOTO
Elewacja apartamentowca wykonana z prefabrykatów
OPEN PHOTO
Elewacja apartamentowca wykonana z prefabrykatów
OPEN PHOTO

Description of execution

The scope of the first stage of the investment included the production of 114 balcony slabs (installed from the courtyard side of the building), filigree floor slabs and staircase elements. The biggest design and production challenge set by the investor and architects was to meet the requirements for prefabricated elements of balconies and cornices, which are an important part of the exterior façade.


A total of 365 balconies in 126 types and 215 cornice elements in 21 types were produced, requiring more than 150 moulds to be made with great precision. Each of them had individually designed geometry, slopes, elevations, drainage details and details for mounting to the main structure of the building. All elements were manufactured as mass-coloured and were subjected to a sandblasting process to obtain a rough structure revealing the aggregate.


Before starting the actual production, work was carried out on the target concrete mix and the finish of exposed surfaces. Many samples were made, differing in terms of dye proportions, aggregate type and fraction, and the level of surface sandblasting of the elements. Once the target sample was achieved, a 1:1 scale mock-up of the balcony was made and delivered to the construction site for approval by the architects.


‘The team, consisting of representatives of the investor, contractor, prefabrication plant technologists and designers, made the fundamental decisions in this regard on the construction site, during methodical work on samples and mock-ups. During the meetings, the proportions of the concrete mix fractions and the methods of finishing it on each of the balcony surfaces were determined, depending on the expected aesthetic effect and functional parameters (e.g. slip resistance). At the same time, the colour proportions and aggregate types were selected with the objective of achieving the right shade and texture on all exposed surfaces of the prefabricated elements – the visible front of the façade, the floor, the ceiling – as a statement in relation to the other façade elements. The behaviour of the material in different weather conditions was tested, e.g. depending on the hydrophobicity method used. The knowledge and experience of the technologists and designers at the Betard prefabrication plant proved invaluable - from shaping the formwork for the demanding and detailed geometry, to knowledge of the mechanical and physicochemical properties of the material’.

– Zbigniew Maćków, Szymon Brzezowski for Architektura Murator, June 2023.


‘Drainage was ensured by enveloping in the direction of a discreet canal formed in the place where the face of the prefabricated element broke, while at the same time developing a drip detail to prevent water from seeping under the prefabricated element and dripping onto the balconies below’.

– Zbigniew Maćków, Szymon Brzezowski for Architektura Murator, June 2023.


The production of the elements took place from October to May, which posed an additional production challenge to ensure that each of the prefabricated elements met the visual requirements.


The assembly of the façade elements took place along with the construction of the building, which required a very high production rate. After demoulding, each of the elements was additionally subjected to a sandblasting and hydrophobicity process.



*For over 30 years, we have specialised in the manufacturing of prefabricated elements for construction: from residential buildings, through public utility and industrial facilities, to complex elements of civil engineering, road, bridge, and hydraulic and structures. Our goal is to produce the highest quality building materials from concrete, including customised prefabricated elements made to order for companies and individual recipients, regardless of the type and size of the investment.

SHARE:

  • Udostępnij pocztą
  • Udostępnij linkedin
  • Udostępnij facebook

PROJECT INFORMATION

(5)

RELATED FINISHED PROJECTS

(4)

RELATED PRODUCTS

Płyta balkonowa wizualizacja

Balconies

Balcony slab

SEE

DOWNLOAD DOCUMENTS

PRODUCT FEATURES

QUALITY

High-quality elements

SYSTEM CONNECTORS

System thermal insulation connectors that compensate for displacements caused by temperature differences and thus counteract scratches

DRAINAGE

Possible drainage to downpipes - elimination of significant drips on vertical edges

DURABILITY

High durability of components in the appropriate frost and water resistance class

SPEED

Speed of construction

FINISHING

Possibility to expose elements in raw concrete, also dyed in mortar

certyfikaty

Certyfikat | Długołęka Przywory Wieruszów Kielce I Kielce II Gajków | El. do zastosowań konstrukcyjnych

certyfikaty

Certyfikat | Bydgoszcz | El. do zastosowań konstrukcyjnych

deklaracje

kdwu | Gajków | El. balkonów

deklaracje

dwu | Bydgoszcz | El. balkonów

deklaracje

kdwu | Kielce II | El. balkonów

deklaracje

kdwu | Kielce I | El. balkonów

deklaracje

kdwu | Przywory | El. balkonów

deklaracje

kdwu | Wieruszów | El. balkonów

deklaracje

kdwu | Długołęka | El. balkonów

DOWNLOAD ALL DOCUMENTSPobierz wszystkie
Płyty elewacyjne - profil

Facades

Façade elements

SEE

DOWNLOAD DOCUMENTS

PRODUCT FEATURES

SHAPE

Possibility of achieving attractive architectural forms

COLOURS

Possibility to use different forms of finishes, colours

DURABILITY

High durability of the façade

RESISTANCE

Weather resistance of the prefabricated elements

SPEED

Speed of construction

certyfikaty

Certyfikat | Elementy ścienne – dw

certyfikaty

Certyfikat | Kielce1 | El. prętowe

certyfikaty

Certyfikat | Bydgoszcz | El. prętowe

certyfikaty

Certyfikat | Długołęka Przywory Wieruszów Gajków | El. prętowe

certyfikaty

Certyfikat | Kielce1 | El. ścian

certyfikaty

Certyfikat | Bydgoszcz | El. ścian

deklaracje

dwu | Bydgoszcz | El. ścian

deklaracje

dwu | Długołęka | El. ścian

deklaracje

dwu | Gajków | El. ścian

deklaracje

dwu | Kielce1 | El. ścian

deklaracje

dwu | Przywory | El. ścian

deklaracje

dwu | Wieruszów | El. ścian

deklaracje

dwu | Długołęka | Słupy

deklaracje

dwu | Gajków | Słupy

deklaracje

dwu | Przywory | Słupy

deklaracje

dwu | Wieruszów | Słupy

deklaracje

dwu | Kielce1 | Słupy

deklaracje

dwu | Bydgoszcz | Słupy

DOWNLOAD ALL DOCUMENTSPobierz wszystkie
Płyta stropowa filigran - profil

Floor elements

Filigree floor slab

SEE

DOWNLOAD DOCUMENTS

PRODUCT FEATURES

Shape

Unlimited possibilities for designing floor surfaces in terms of shape and size

Recesses

Possibility of making the necessary cuts and openings provided for in the documentation

Weight

Low slabs dead load (125-175 kg/m²)

Installation

Installation from a car without intermediate storage possible - ‘installation directly from the car

Construction site

Adequate low demand for back-up area on site

Optimisation

Reduced labour intensity on site, resulting in shorter construction cycles and lower construction costs

certyfikaty

Certyfikat | Przywory Gajków | Płyty Stropowe Filigran

certyfikaty

Certyfikat | Płyty Stropowe Filigran

certyfikaty

Certyfikat | Kielce | Płyty Filigran

certyfikaty

Certyfikat | Bydgoszcz | Filigran

deklaracje

dwu | Bydgoszcz | Płyty stropowe Filigran

deklaracje

dwu Kielce | Płyty stropowe Filigran

deklaracje

dwu | Przywory | Płyty stropowe Filigran

deklaracje

dwu | Długołęka | Płyty stropowe Filigran

DOWNLOAD ALL DOCUMENTSPobierz wszystkie
Biegi schodowe prefabrykowane

Staircase elements

Stair flights and landings

SEE

DOWNLOAD DOCUMENTS

PRODUCT FEATURES

SPEED

Rapid construction on site

QUALITY

High component quality and repeatability

FORMWORK-FREE TECHNOLOGY

Elimination of complicated, time-consuming formwork and reinforcement on the construction site as well as formwork removal

SITE TRAFFIC

Providing traffic during the construction of storeys

SURFACE

Lower surface does not require plastering (can be painted)

ADAPTATION

Possibility of forming the component in the reverse position (negative)

certyfikaty

Certyfikat | Kielce I | El. biegów schodowych

certyfikaty

Certyfikat | Długołęka Przywory Wieruszów Kielce2 | El. biegów schodowych

certyfikaty

Certyfikat | Bydgoszcz | El. klatek schodowych

deklaracje

dwu | Długołęka | El. biegów schodowych

deklaracje

dwu | Wieruszów | El. biegów schodowych

deklaracje

dwu | Kielce I | El. biegów schodowych

deklaracje

dwu | Przywory | El. biegów schodowych

deklaracje

dwu | Bydgoszcz | El. klatek schodowych

deklaracje

dwu | Wieruszów | El. biegów schodowych |

deklaracje

dwu | Długołęka | El. biegów schodowych

deklaracje

dwu | Przywory | El. Klatek schodowych

certyfikaty

Certyfikat | Długołęka Przywory Wieruszów Kielce2 | El. Biegów schodowych

certyfikaty

Certyfikat | Kielce | El. Schodów

certyfikaty

Certyfikat / Długołęka / Biegi schodowe / DE

DOWNLOAD ALL DOCUMENTSPobierz wszystkie

REALIZACJE

Monter na budowie.

NASZE REALIZACJE

Nasze produkty dostarczaliśmy do setek realizacji o całym przekroju skali i zastosowań - od małej architektury i budynków jednorodzinnych, przez prestiżowe realizacje mieszkaniowe do wielkich hal produkcyjnych, czy autostrad, mostów i stadionów. Poznaj realizacje, w których wzięliśmy udział.

NASZE REALIZACJE